Fender
Logo icon
Guitars
Home / Tags / Start with O / OUTPUT LONG LEADS

OUTPUT LONG LEADS - Fender Guitars : Pricing & Market Analysis

$30.00
Price
1
Total Listings
1
Sold Items
1
Countries
30.00
Avg. Price
Market Pulse
Success Rate: 100%
Median Price: $30.00
Active Listings: 0
Notice: We may earn a commission from eBay links; this does not affect how we present data and helps support the site.

Market Analysis Dashboard

Comprehensive data visualization for OUTPUT LONG LEADS market trends, sales performance, and pricing insights.

Listing Status

Distribution of OUTPUT LONG LEADS listings by status: 0 active (0%), 1 sold (100%), and 0 unsold (0%).
Active: 0
Sold: 1
Unsold: 0

Item Condition

New: 0 (0%)
Used: 1 (100%)
Refurbished: 0 (0%)

Market Overview

Market Volume:
1 listings
Sell-Through Rate:
100%
Market Value:
$30.00
Price Volatility:
0.0% (CV)
Seller Concentration:
100%

Recent Sales Analysis

$30.00
Avg. Sale Price
1
Total Sold
$30.00
Total Value

Pricing Overview Comparison

All Listings
Active
Sold
Unsold

Top Sellers

1
Total Sellers
1
Avg Listings per Seller
1xthrew90
Top Seller

Top Countries

Country Listings Percentage
US flag US 1 100%

Global Distribution

Not enough geographic data for visualization

Regional Analysis

Price by Country

Price by Condition

Price Range Analysis

Range Width:
$0.00
Standard Deviation:
0.00
Coefficient of Variation:
0%
Median-to-Mean Ratio:
100%
Top 10% Threshold:
$39.00

Price Outliers

Highest Price:
$30.00
0% above average
Lowest Price:
$30.00
0% below average
Potential Underpriced:
0 listings
Below $21.00
Potential Overpriced:
0 listings
Above $45.00

Price Comparison by Listing Status

Average Price
Median Price

Status Distribution

100%
Sell-Through Rate
0%
Active Rate

Success Rate by Condition

Status Metrics

Status Count Percentage Avg. Price Min-Max Price
Active 0 0% $0.00 $0.00 - $0.00
Sold 1 100% $30.00 $30.00 - $30.00
Unsold 0 0% $0.00 $0.00 - $0.00

Status by Condition

Price Comparison by Status

Active
Sold
Unsold

Top Sellers Distribution

Seller Metrics

Total Sellers:
1
Avg. Listings per Seller:
1
Top Seller Concentration:
100%
Market Concentration:
Highly Concentrated

Geographic Distribution

Top Sellers

Rank Seller Listings Market Share View
1 1xthrew90 1 100%

Top Active vs. Top Sold Sellers

0
Active Sellers
1
Sellers with Sales

Market Summary: output long leads

A comprehensive overview of market trends and sales performance for this item.

Market Size & Volume

The data encompasses 1 individual listings across 1 different countries, listed at prices ranging from $30.00 to $30.00. Price metrics show an average of $30.00 and a center point (median) of $30.00.

Market Liquidity

There are presently 0 current listings in circulation. Historical data reveals exactly 1 completed transactions, yielding a 100% sell-through rate. The average sold price is $30.00, which offers valuable insight into market pricing patterns.

Market Composition

The market includes 1 individual sellers with an average of 1.0 listings per seller. By condition, the market consists of 0% new items, 100% used items, and 0% refurbished items.

Geographic Distribution

The market for output long leads has a global footprint with listings from 1 countries. The top country by volume is US (100%).

Price Analysis

The price distribution shows a standard deviation of $0.00, indicating a relatively stable market. The coefficient of variation is 0.0%. The median-to-mean ratio of 100.0% suggests the distribution is fairly symmetric with some low-priced outliers affecting the average.

Market Value Assessment

The total market value for output long leads is estimated at $30.00. Successful sales account for $30.00 of this value. Based on pricing trends and sell-through rates, this appears to be a high-demand market with consistent pricing.

Related Listings

Browse the latest items related to OUTPUT LONG LEADS that have appeared in the marketplace.

No recent listings found at this time.
Check back soon for new listings related to this tag.